Abstract
With the weathering of iron sulfide minerals, acid rock drainage (ARD) emanates from the 60-millon tonne Main Waste Stockpile (MWS) at the Red Dog Mine. Following completion of the stockpile, a collection trench was constructed in 2012–2013 to capture and treat a portion of the ARD, and a cover system was emplaced from 2021 to 2025 to cover 90% of the stockpile. Select wells in the collection trench are associated with the different cover phases. Analysis of the water chemistry of samples collected at the wells indicates increased pH and decreased dissolved solids with each phase of the cover along with significant changes in flow and solutes such as aluminum, iron, sulfate, and zinc. Although the cover should continue to decrease ARD volume, acidity, and solute concentrations, an evaluation of historical acid production and iron sulfide consumption in the stockpile indicates a likely majority of the iron sulfide content remains available for weathering and acid production. Continued MWS ARD monitoring is necessary to evaluate the multi-year effect of the cover because of the variability of the pre-cover ARD, identification of seasonal and multi-year precipitation influences on ARD generation, and a yet to be determined influence of the cover on the volume of infiltrating precipitation.