Sign in
A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing
Journal article   Peer reviewed

A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing

Thomas M Gorman, Sarah (Xiao) Wu and John S Morris
Computers and Industrial Engineering, Vol.26(4), pp.757-764
1994
url
https://doi.org/10.1016/0360-8352(94)90010-8View

Metrics

Details